|
Phase2 code and writeup
|
|
0
|
11
|
October 29, 2026
|
|
Phase 2 Algorithmic Writeup
|
|
0
|
10
|
October 29, 2026
|
|
[Phase 2 Algorithmic Contribution] Solving cumulant propagation's depth problem with scale separation
|
|
0
|
17
|
October 28, 2026
|
|
Phase 2 Write Up - No fitting - Estimator #337631
|
|
0
|
17
|
October 28, 2026
|
|
[Phase 2 write-up] κ₄: shape from theory, level from the fitted table (submission #337608)
|
|
0
|
11
|
October 28, 2026
|
|
[Write-up, submissions 337654 and 337568] The cumulant chain as a balanced system of errors: what K=3 cannot see on 1024×16, and why exact pieces break it
|
|
0
|
7
|
October 28, 2026
|
|
Phase 2 Report, Submission 337559
|
|
0
|
9
|
October 28, 2026
|
|
[Phase 2 write-up] A first-order κ3 lineage chain: what each part is worth and where it stops (submission #337601)
|
|
0
|
8
|
October 28, 2026
|
|
[Phase 2 write-up] How errors survive depth in cumulant propagation: a fit-free survival law, checked on ARC's reference chain, and four flopscope issues (submission #337350)
|
|
1
|
27
|
October 28, 2026
|
|
[Phase 2 write-up] A factorized K=3 cumulant chain whose corrections are fitted through its linearised mean propagation (submission #337048)
|
|
0
|
16
|
October 28, 2026
|
|
[Phase 2 write-up] Algorithmic contribution: e30_a plus message-passing corrector and covariance-defect dictionary (submission #337552)
|
|
0
|
9
|
October 28, 2026
|
|
[Phase 2 write-up] Where the error of the factorised cumulant chain lives, and what it costs (submission #337457)
|
|
0
|
13
|
October 27, 2026
|
|
Phase 2 write-up + materials (mliston) - submission #337641
|
|
1
|
65
|
October 27, 2026
|
|
[Phase 2 write-up] Sphere-frame cumulant propagation with age-structured κ₃ sources, and exact symmetry as a diagnostic of a tuned closure (1.50e-9, submission #337205)
|
|
7
|
48
|
October 26, 2026
|
|
# Phase 2 update: flopscope v0.12.3, deadline extension, and final submission nomination
|
|
6
|
140
|
October 26, 2026
|
|
[Phase 2 write-up] Cumulant-history moment closure under a metered budget: a low-rank κ₃ history, exact terminal refits, round-trip engineering, and where the error is born (1.92e-9, submission #333755)
|
|
0
|
26
|
October 25, 2026
|
|
[Phase 2 write-up] ARC SIMPLE in FlopScope: a cumulant-propagation implementation (#337649)
|
|
0
|
19
|
October 25, 2026
|
|
[Phase 2 write-up] Zero-Sample K=4 via Factored n^3-Memory Transport at 1024 x 16: 11.8x below augmented K=3, why memoryless closures stall, the only exact K=4 at 1024 x 16 (#336537)
|
|
4
|
92
|
October 25, 2026
|
|
Phase 2 write-up (cosmmmos): cumulant chain with exact repeated-index gains (γ = Φ − d₀d₂) and exact semi-diagonal births, MSE 4.0e-6 → 3.2e-8
|
|
1
|
18
|
October 24, 2026
|
|
[Phase 2 write-up] A third-cumulant chain at its boundary: random projections, a skew law, and where the next order's accuracy lives (submission #333534)
|
|
3
|
59
|
October 24, 2026
|
|
[Phase 2 write-up] A moment chain with a learned cross-layer corrector and a wall-time guard (submission #337436)
|
|
0
|
21
|
October 24, 2026
|
|
[Phase 2 write-up] A learned corrector that reads the engine's cross-neuron terms, saturation-aware compute and a free fourth-cumulant fold on factored cumulant propagation at width 1024 (submission #336955)
|
|
3
|
22
|
October 24, 2026
|
|
Good game well played
|
|
13
|
115
|
October 24, 2026
|
|
[Phase 2 write-up] A bias/variance error budget for factored K=3 cumulant propagation: what the slices can tolerate, measured (submission #337475)
|
|
1
|
36
|
October 24, 2026
|
|
How the hidden-set evaluation invokes whest run
|
|
5
|
117
|
October 23, 2026
|
|
Notes on the Problem (Phase 1)
|
|
3
|
146
|
October 23, 2026
|
|
[Phase 2 write-up] A cost-engineered factorized K=3 chain + transferred LT2 corrector (3.82e-9) (Submission #337389)
|
|
1
|
29
|
October 23, 2026
|
|
[Phase 2 write-up] What noise-corrected oracles show about a cumulant-propagation estimator (submission #337578)
|
|
0
|
24
|
October 22, 2026
|
|
[Phase 2 write-up] The (3,1) slice of κ₄: where V29 loses accuracy, and a two-term closure confirmed in a pre-registered test on 77 held-out networks (submission #334821)
|
|
3
|
77
|
October 21, 2026
|
|
[Phase 2 write-up] A bias/variance error budget for factored K=3 cumulant propagation: what the slices can tolerate, measured (submission #337475)
|
|
0
|
23
|
October 21, 2026
|