@kingsley_nweye Apologies for any confusion. To clarify further, I was counting both the public and private evaluations. In the public evaluation, we are tasked with controlling three buildings, and in the private evaluation, we control 6 buildings (public 3+private 3). This brings the total to nine buildings that are being optimized over the three-month period.